Project

Creek restoration in Männedorf

We developed the "Action plan for the implementation of measures addressing natural hazards" for the municipality of Männedorf. This included restoring the continuity of the village creek, with incrementally removing a dam while monitoring the effects. We assisted the municipality with hydraulic engineering and design measures to create a long-term stable and near-natural stretch of water.

Our services

  • Assessing sediment transport to the Lake of Zurich
  • Defining the desired development
  • Determining and dimensioning immediate measures to combat neophytes, remove man-made materials and restore passage for sediment and aquatic life
  • Conducting interim checks on the streambed development and sediment transport
  • Supporting structural and organizational measures for sustainable, low-maintenance solutions

Image: The upgraded Dorfbach in Männedorf
Picture Credits: © EBP

Contact persons