Project

Effretikon Train Station Refurbishment Study

Effretikon Train Station has various shortcoming and does not meet all of the requirements of the Swiss Disabilities Act. By removing the existing track 4, a good solution that meets all the requirements has been found, with a new pedestrian underpass and the widening of the two central platforms. The structural measures require extensive adjustments to the entire station: tracks, platforms, all entrances and the bicycle crossing must be redesigned.

Our services

  • Elaborating all civil engineering and engineering structures including route construction, underground cable construction and drainage together with the necessary auxiliary construction measures
  • Coordinating with the relevant departments of Swiss Federal Railways (SBB)
  • Providing support for developing the track project plan
  • Designing the new platform facilities for tracks 1 to 5, including the respective platform accessways
  • Planning the new central pedestrian underpass with a width of eights meters
  • Drafting the construction plan for the new pedestrian underpass and the Rosenweg bicycle crossing
  • Construction phase planning
     